Imagine your headaches gone. Your timelines met. Your problems handled. That's exactly what we've been providing our customers since 1934. Though the industry has certainly changed over the years, our commitment to provide exemplary service has remained consistent. We simply get the job done. Period.

Centennial Wireless
What they needed:
Centennial Wireless was having trouble with maintenance and poor visibility of their existing lighting units.
How we did it:
We recommended and facilitated a change from the darker blue neon to a brighter shade of blue and an LED installation. The result was a dramatic improvement in both visibility and energy efficiency.
Accor
What they needed:
A simple, streamlined way to manage permitting for more than 325 Red Roof Inn installations.
How we did it:
We handled all the permitting for them and eliminated the hassle.
GameStop
What they needed:
Signage changes at all store locations across the country.
How we did it:
We performed the changeover on 750 locations in one year.
Hooters
What they needed:
Changeover signage at locations in North Carolina.
How we did it:
We were able to obtain permits, but were forced to leave the existing structure. So we retrofitted the existing fixture to accommodate everyone.
AMC Theatres, Chicago
What they needed:
To update and upgrade the existing marquee.
How we did it:
We incorporated LEDs to reduce maintenance and custom painted the site for the greatest impact.
Express
What they needed:
An extremely quick changeover of 400 stores.
How we did it:
We finished in under six months.